ASME Section VIII Div. 1
Pressure Vessel

Full Design Package

Scope of Work

MPGIA, LLC will provide comprehensive engineering and drafting services for one (1) Pressure Vessel in accordance with ASME Section VIII, Division 1 requirements.

Mechanical Design & ASME Calculations:

Detailed calculations per UG-22 loadings as applicable, such as

Detailed Fabrication Drawings:

All drawings with data design and fabrication details, including Bill Of Materials.
General Arrangement (GA) Drawing.
Welds and Materials (WM) Drawing.
Platform and Ladder (PL) Drawing.
Upon request.

Pricing Schedule

g76512bf3a313574c53408d420b4e9bcfeca854879cb03e19b67204cfb0bc7db079688401e3c87fe5fe1df6e3ae9618e5a64453f80fe9dbdd137bc2d06c190e5b_1280-2703460.jpg
Mechanical Design & ASME Calculations
(Includes Compress report)
Starting at $2,000
g76512bf3a313574c53408d420b4e9bcfeca854879cb03e19b67204cfb0bc7db079688401e3c87fe5fe1df6e3ae9618e5a64453f80fe9dbdd137bc2d06c190e5b_1280-2703460.jpg
Detailed Fabrication Drawings
(CAD Set – Plan, GA, WM & PL Drawings)
Starting at $1,800
g76512bf3a313574c53408d420b4e9bcfeca854879cb03e19b67204cfb0bc7db079688401e3c87fe5fe1df6e3ae9618e5a64453f80fe9dbdd137bc2d06c190e5b_1280-2703460.jpg
Extra Detailed Fabrication Drawing
Starting at $500
g76512bf3a313574c53408d420b4e9bcfeca854879cb03e19b67204cfb0bc7db079688401e3c87fe5fe1df6e3ae9618e5a64453f80fe9dbdd137bc2d06c190e5b_1280-2703460.jpg
P.E. Validation & Stamping.
Starting at $2000

Add-ons & Specialized Analysis (If required):

Finite Element Analysis (FEA): Starting at $2,500.00 per nozzle/attachment for non-standard geometries.
Lethal Service: Quoted upon request.
High-Cyclic Life Analysis: Quoted upon request.

Deliverables & Lead Time:

Preliminary Mechanical Design & ASME Calculations for Approval: 3-5 business days after receipt order and data sheet.
Preliminary Drawings for Approval: 3-5 business days after receipt order and data sheet.
Final Stamped Package: 3-5 business days after final drawing approval.

Terms and Conditions

Deposit
50% Upfront
(To start Engineering/Design)
Final Payment
50% Upon Delivery of Documents
*Included Revisions
2 Rounds (Minor adjustments only)
**Additional Work
$150/hr for Out-of-Scope requests
* “Minor revisions” include typos, data corrections, or formatting.
** “Major changes” include re-calculations, material changes, or design alterations after the initial revision.
Scroll al inicio